Drastically reducing
(TDS) and rust build up in the pipes and heat exchanges.
Drastically reducing
the useage of water from bleed off.
Keeping the plate
count and legionella under control.
Power saving and saving
the environment.
Water, is a good solvent and picks up impurities easily.
Pure water--tasteless, colourless, and odorless—is
often called the universal solvent. Total dissolved
solids (TDS) comprise inorganic salts(principally
calcium, magnesium, potassium, sodium, bicarbonates,
chlorides and sulfates) and some small amounts of
organic matter that are dissolved in water. This is
also called, hard water. With TDS in the pipes and
valves of cooling towers and evaporator condensers,
scale, which is formed by TDS, builds up in the pipes
and valves and increases power used, to push the water
through the pipes. With a build up of only 5mm of
scale, an extra 40% more electricity is used. Reduce
the scale, and keep the pipes clean, and you will
save 40% power.
By placing 3-4 bands of mats, according
to the quantity of water in the towers, with each
mat measuring 250 x 300mm, the mats send a frequency
into the water, which resonates the molecules of the
scale build up, and starts to break the scale down.
Because the water is moving at speed, the magnetic
field works very efficiently. If the water does not
move quickly, the magnetic field will not work as
quick. The scale when broken down will mix with the
water and is then passed into the side stream filter,
which can be cleaned out. This process can take up
to 2-3 months. If the pipes are half clogged with
scale and rust, it may take a little longer.
A test was carried out at a major
shopping complex in Brisbane, with outstanding results.
After some 8 months, the pipes were disconnected from
the heat exchanger, and the inside of the pipes were
very clean and one could see that the scale had been
removed.
With the mats in place,
and as the water travels through the pipes, the frequency
attacks the solids in the water. With the magnetism
working, this breaks down the solids. The more solids
in the water, the more the bleed off. With the test,
the percentage started off at 23% bleed off, which
was about 14000 litres in the summer and about 8000
litres in the winter. After about 3 months the total
amount of bleed off was between 0%- 6%. The mats were
removed for about a month, which raised the bleed
off once again. As soon as the mats were replaced
the percentage dropped again. The percentages were
from 23% to about 5%. The amount of water saved would
be approx. 2.3 million litres of water per year.
With the Geopure Mats in place, maintenance
will be drastically reduced. It will be up to the
chemical Companies to decide if the chemicals need
to be reduced or not. The magnetic field will have
no effect on any sensitive meters, if they are more
than one meter away from the mats, These mats can
travel by air freight, with no effect to aircraft
instruments.
One of the biggest problems with
cooling towers is to keep the plate count down within
the Australian Safety margin for cooling towers, which
is 100,000 colony forming units, and also the legionella,
out of the towers.
The millions of frequencies that are put out by the
mats, confuses the working ability of the bacteria,
and so the bacteria die off. All bacteria have a frequency
range, and the mats cover this range. With the test
taken in Brisbane, the test showed a less than 2000
cfu’s, for the plate count, and a less than
10 for the legionella. These tests are carried out
by a NATA Accredited Laboratory in Brisbane.
If the pipes have a coating of scale
with a depth of only 5mm, the power output will increase
by about 40%, as the tower has to produce more power
to force the water through. If the pipes are clear
of the scale, the tower will save 40% power. If all
towers had Geopure’s mats installed, just imagine
how much power would be saved, and the less amount
of pollution going into the atmosphere, as the power
stations, wouldn’t have to work as hard. Clean
pipes, clean air.
The physical laws state that the
‘flow rate’ is an interaction between
magnetic fields and water molecules which is not strong.
This has no effect on still water. Water must be moving.
With the Geopure Water Treatment Mats, the water passes
through alternating magnetic fields with speed. All
molecules and bacteria vibrate. By going past this
magnetic vibrating frequency, the molecules and bacteria
resonate because of the magnetic field sequence. This
breaks down the molecules .
With this action, the calcium is unable to form on
the pipes, as the frequency is continually breaking
down the calcium particles and water solids. Also,
the rust that has formed in the pipes before the mats
were placed, will be broken down and the rust will
turn into a powder form, oxide, and will be flushed
away. This will enable the pipes to stay clean. If
the mats are removed, the scale buildup will start
again.
The power of the mats will run 24-7, as the magnets
that are used, are permanent magnets.
The 3-4 bands of mats are installed
before the heat exchanger, as this gives the maximum
power needed for eliminating the scale. The mats need
to be placed on pipes that are either Stainless steel,
plastic or copper. If the mats are placed on steel
pipes, the steel absorbs the power from the mats,
and the process will not work. If the pipes are steel,
then a 1000mm section of stainless steel, needs
to be placed in the line before the heat exchanger.
Protection of Geopure’s Water Treatment Mats,
are covered by an International Patent Pending.
|